Skip to content

Our Website uses cookies. Cookies are small text files held on your computer that help us understand how you use our Website. Our cookies do not store any personal information about you, and you can delete and block cookies via your browser settings at any time. By clicking “Ok” you agree to accept our use of cookies. Learn more by reviewing our privacy policy.

Two of three original buildings at an old lumber yard were re-purposed to serve as the new location for a charter high school campus. This phased construction project required placement of temporary modular classrooms and a restroom, utilities, perimeter fencing, and converting the former milling structure to a multipurpose room prior to the start of the school year. The combination gym/cafeteria/assembly building features a roll-up door, acoustical panels for noise reduction, expandable seating, collapsible projector screen, locker rooms with showers, and a separate dance studio/computer arts room. A versatile sports floor was also installed to allow for basketball, volleyball and indoor soccer within this confined space. A second 80,000 sq. ft. structure was taken back to its original shell to incorporate wall-to-wall classrooms with a mezzanine and central gathering space. An expansive roll-up door was added to allow natural light. The modulars were removed once the school year ended and the existing space was updated with a new parking lot, a 14,000 sq. ft. sports turf field, an outdoor gathering space/garden, bioswale and rain water retention basin, landscaping and hardscape.

Downtown College Prep (DCP) was approved in 1999 as the first charter high school in Silicon Valley. The first campus opened in 2000 and in 2008, DCP expanded to include middle school students as well.

Awards

Gold Nugget Awards – 2018 Grand Award Best Rehabilitation Project

Related Projects

Contact Us